Photos

Keyword: Category: Tag: Sort By:
A driver prepares the construction site office trailer for removal Sept. 27, 2016, in the central campus area outside the new facility at the I.G. Brown Training and Educaiton Center in Louisville, Tenn. Site managers are operating from the lower floor of the new classroom building until project completion. (U.S. Air National Guard photo by Master Sgt. Mike R. Smith)


Trailer removal

A driver prepares the construction site office trailer for removal Sept. 27, 2016, in the central campus area outside the new facility at the I.G. Brown Training and Educaiton Center in Louisville, Tenn. Site managers are operating from the lower floor of the new classroom building until project completion. (U.S. Air National Guard photo by Master Sgt. Mike R. Smith)

Related Imagery

160927-Z-SM234-001.jpg

DOWNLOAD PHOTO
(5 MB)



Tags




< Back to Main Gallery